Choosing the route

The pipeline needs to be constructed between a connection point on the existing transmission network and the towns to be supplied with gas. Various route options are being considered taking into account the following criteria:

After consideration of the above factors, the route corridor has been selected for further investigation and survey to establish the best solution.